Construction Updates

AUGUST 2-Pod placement began at Orchard

JULY 26-Pods were placed at Rick Marcotte and insulation was installed.

JUNE 28-All the modulars have arrived at Rick Marcotte and they have started to arrive at Orchard.

JUNE 21-The ZEMs have been delivered to Rick Marcotte and are ready to be installed! These 4 are only a portion of the modulars that will be under construction this summer.

Today, the South Burlington School District held a groundbreaking at Rick Marcotte Central School and Orchard School. In attendance at Rick Marcotte were Superintendent Violet Nichols, Senior Director of Operations and Finance, Tim Jarvis, School Board Member Kate Bailey, RMCS Principal Lissa McDonald and South Burlington City Council Clerk, Tim Barritt.

At Orchard, Superintendent Violet Nichols, Senior Director of Operations and Finance, Tim Jarvis, School Board Member Kate Bailey,  Mark Trifilio, Orchard Principal and Olivia Kane, Orchard Assistant Principal.

Also in attendance were members of DEW Construction and architectural firm Dore+Whittier, who may partners with the district on this project.

Construction will continue throughout the summer and we'll continue to add updates here.

Previous Slide
Next Slide
Gravel

Dore + Whittier

Dore + Whittier, the architects working on the ZEMs construction, have put together a full report on this project, including enrollment analysis, project goals and a cost summary.

Dore + Whittier ZEMs Review

Four ZEMs will create 8 classrooms, 4 at Rick Marcotte Central School and 4 at Orchard Elementary. In addition to the classrooms, there will be four smaller rooms, for group work and other activities outside of the regular class structure. The cost of the ZEMs also includes the connectors to the buildings and hallways to each class, as well as landscaping. This is all in an effort to make these units feel like an organic extension of the school rather than a temporary structure.

Each unit will have 2 classrooms and 1 group room (making a total of 4 classrooms at each school) that will provide students with space for:

  • working in small groups

  • quiet activities

  • independent learning

  • their own cubby and hook in the classroom

ZEM specs: 

  • Rick Marcotte: 6,661 square feet

    • Each classroom averages 959 square feet

      • Each Project Room averages 262 square feet

  • Orchard Elementary 6,861 square feet

    • Each classroom averages 918.5 square feet

      • Each Project Room averages 257 square feet

  • Roof includes R-60 cavity insulation, plus continuous tapered on top

  • Walls are R-40 dense pack cellulose insulation, and the walls are framed with two 2x4 stud walls to avoid thermal bridging

  • Framed floor: R-38 mineral wool cavity insulation

The connecting corridors will include:

  • Walls: R-20 stud (2x6) cavity dense pack cellulose + R-12.5 ci

  • Roof: R-60 cavity insulation, plus continuous tapered on top.

  • Slab on grade: R-10 below slab; R-10 vertical at walls for 48”

  • Framed floor: R-38 mineral wool cavity insulation

Architects Dore + Whittier have been working closely with the District to construct the ZEMs. See images of the proposed plans here as well as below.